CONSTRUCTION OF THE CHAPEL

The thumbnails give access to large and small versions of the images, to save on download time, take a look at the medium size first and then download the large size version of any that interest you.

The large versions are very large and it is recommended that you download to your hard drive and then use whatever image viewing software you have to view. There is a massive amount of detail in many of the shots, but the originals were of mixed quality.

Back to front page of Construction gallery.

IMAGE

DESCRIPTION

DATE

MEDIUM

LARGE

NOTES

177
Foundations
June 31
200
Looking South East
October 31
213
Looking South West
November 31
214
First recognisable details
December 31
215
December 31
216
Looking North West
December 32
217
Main Entrance
January 32
218
South Face
February 32
219
Main Entrance
February 32
220
North face
March 32
221
Main Entrance
March 32
222
Main Door Stones visible
April 32
223
North Face
April 32
255
South Face
May 32
256
Wooden supports for domes
May 32
257
Concrete for the domes was hauled up with the crane on the right.
July 32
258
South Face
July 32
259
South Face
June 32
310
Facing stones all arived crated in straw.
June 32
311
South Face
August 32
312
East End
August 32
313
South Face
September 32
314
From the Terrace
September 32
315
From the Terrace
October 32
316
Interesting concrete delivery system
October 32
317
From the Terrace
November 32
318
South Face
November 32
319
South Face
December 32
320
From the Terrace
December 32
321
South Face
January 33
322
From the Terrace
January 33
323
Almost topped out
Feb 33
324
South face
Feb 33
325
From the Terrace
April 33
326
South Face
April 33