CONSTRUCTION OF THE SWIMMING POOL The thumbnails give access to large and small versions of the images, to save on download time, take a look at the medium size first and then download the large size version of any that interest you. The large versions are very large and it is recommended that you download to your hard drive and then use whatever image viewing software you have to view. There is a massive amount of detail in many of the shots, but the originals were of mixed quality. |
|||||
IMAGE |
DESCRIPTION |
DATE |
MEDIUM |
LARGE |
NOTES |
| 073 | The BP steelwork was part of the first work carried out on the site | September 1929 | |||
| 075 | Major concrete laid | March 1930 | |||
| 197 | Topped out and ready for fitting out. | October 1931 | |||
| PR shot of finished Swimming Pool | 1940 | ||||
| As I remember the BP | 1965 | ||||
| As it is today | 2004 |
||||